Since I won't get any work done for the next few weeks, this is an time for an update.
So far, the following has been repair or replaced.
1. R&R right front floor pan
2. R&R right top sill
3. R&R right front inner sill
4. Repaired right rear floor and inner sill
5. Repaired right inner fender
6. R&R right lower sill
7. Install new engine stablizer bushings
So what's next? I just ordered more bits, this time from Seven Enterprise. New front brake rotors, pads, piston and seals for one caliper. Hopefully, I can fix the seized caliper. If not, I'd have to either have it rebuilt, or replaced.
Things left to do.
1. Attach right "A panel"
2. Repair right rear sub-frame (weld some reenforcements)
3. Refresh front brakes
4. Install new engine mounts
No comments:
Post a Comment